Novec alternatives for immersion cooling

Updated 7 November 2026 · Independent, sourced reference

Quick answer

3M said in December 2022 it would stop manufacturing PFAS, including Novec fluids, by the end of 2025. For two-phase immersion, alternatives include Chemours Opteon 2P50, a hydrofluoroolefin fluid. For many sites, single-phase immersion with hydrocarbon or ester fluids is the other route. No fluid is a guaranteed drop-in: requalify with your hardware and tank makers.

Key takeaways

  • 3M’s Novec fluids were widely used in two-phase immersion.
  • Alternatives must be qualified for your tank, hardware and operating temperature.
  • Plan supply, top-up stock and end-of-life handling before switching.
On this page

Request sourcing help for immersion fluid

One short form: fluid, volume, region and your work email. Free for buyers — every request is reviewed by a person.

Free for buyers Manual human review

  1. 1 Your requirements
  2. 2 Contact details

Step 1 of 2 · What do you need?

Step 2 of 2 · Where can we reach you?

We review requests manually. A supplier introduction or response time isn’t guaranteed. Suppliers may pay for introductions; our guidance stays independent.

  • Shared with suppliers only with your consent
  • Never sold or used for newsletters

Your details are used to review and source your request, retained for up to 12 months, and deleted on request to [email protected]. Privacy & terms.

What changed

In December 2022, 3M announced it would exit PFAS manufacturing by the end of 2025. Industry press noted that this would affect two-phase immersion cooling, where Novec products had been widely specified, alongside tightening US EPA rules on PFAS.

Your options

OptionWhat it meansWatch out for
Alternative two-phase fluidQualify a replacement such as Chemours Opteon 2P50Hardware and tank qualification; fluid is still fluorinated chemistry
Move to single-phase immersionHydrocarbon or ester fluids, pumped heat exchangeDifferent tanks; heat density limits
Move to direct-to-chipCold plates with PG25 or treated water loopsRack and CDU changes; residual air cooling
Secure remaining stockBuy top-up volume for the existing fleetAvailability, storage, and future disposal rules

Transition checklist

  1. Inventory installed fluid volume and annual top-up loss.
  2. Ask hardware and tank makers which alternatives they have qualified.
  3. Run a pilot and compare thermal performance and losses.
  4. Plan fluid recovery, recycling or disposal for the old fluid.
  5. Update safety data and staff procedures.

Related: single- vs two-phase immersion · dielectric fluids · Chemours profile.

Free: liquid-cooling fluid RFQ checklist

Two pages: what to specify, documents to demand, and a grid to compare three supplier quotes.

Get the checklist →

Frequently asked questions

Is 3M Novec still available?

3M said it would stop PFAS manufacturing by the end of 2025. Check remaining distributor stock and plan alternatives.

Is there a drop-in replacement for Novec?

Treat no fluid as a drop-in. Qualify any alternative with your tank and hardware makers.

How we source this page

  • Facts come from manufacturer pages, datasheets, owner's manuals and standards bodies, linked under Sources.
  • We do not test products, and no brand pays to be listed or ranked. Advertising and affiliate links are labelled and never change the data.
  • Anything we could not find is marked "not published" rather than guessed. Spotted an error? Tell us.

Sources

  1. DCD: Two-phase cooling hit by EPA rules and 3M’s exit from PFAS
  2. HPCwire: PFAS regulations, 3M exit to impact two-phase cooling
  3. DCD: Chemours launches two-phase immersion cooling fluid
Need this fluid? Free supplier quotesGet quotes